Storm Water Infrastructure & Road Paving Project

Project Overview: Resurfacing streets and improving stormwater systems. Estimated Project Cost: $4,062,693.07. Grant Funding: $4,062,693.07 (applied).

Detailed Description: Remove deteriorated asphalt from Veterans Lane, Centre Street, Deadwood Street, and S Government Street; install subbase/base gravel and new asphalt. Install catch basins, storm leads/connections; new system along South Government Way to route runoff under Highway 3 into Boundary Creek.

Project Benefits: Reduced flooding, improved drainage, safer roads.

Timeline Tender issued September 2025; contract #33819 for 2026 improvements.

Resident FAQs

  • Road closures?
    • Yes, during work; detours notified.